Completed finding and labeling storage for all the remaining parts in the Aircraft Spruce order.
Reinstalled the bolt between the feed wire and the circuit breaker box using a metal locknut in the Aircraft Spruce order. Worked on notes for the assembly drawing while installing new screws for the fuse block, installing an Adele clamp on the ground wires and calculated screw lengths to use in other locations.